Project commissioning for the construction of additional facilities in Mt Isa Mines Concetrator 4 plant as part of the third Ball Mill Project. The No. 4 Copper Concentrator comminution circuit consists of two lines of parallel SAG & Ball mills that operate at 550 t/h per train ahead of two lines of rougher flotation and a common cleaner flotation circuit. To achieve a reduced grind size a third identical ball mill will be installed in parallel with the existing two ball mills. The product from the third milling line will feed to the third line of flotation cells.

Client:

Industrial Commercial Solutions

Project:

Mt Isa Mines (MIM) Ball Mill Project

Services provided:

Earth grid injection testing

HV protection & control system commissioning

Relay & circuit breaker testing

Transformer installation, maintenance & repair